Parking Lot Maintenance
Parking Lot Maintenance
Parking lot maintenance is an on going task. Maintaining your asphalt and or concrete ensures your drainage plan works the way its designed. When the surface cracks it lets the moisture in and as the ground freezes and thaws it will heave your surface creating potholes. Maintaining your asphalt every 3 to 5 years per the manufacturers intent will ensure the expected lifespan of your parking surfaces. Crack fill and seal coating is the only way to insure this and produces the following benefits:
- No pot holes that cause trip & fall liability, flat tires and other auto damage
- Drainage works as designed
- Parking spaces and other details are easy to identify and read
- Increases property value

When you need to re stripe your lot we offer grinding services as well. This removes the old paint and or paint layouts that were done incorrectly. Once the surface is cleaned, then the new layout and paint can be applied.

When using a hot applied crack fill or mastic material with sand, this fills the cracks up well (ranging in gaps 1/8″ to 1″) and prevents weeds from growing in, helps seal the crack from getting worse when water drains in and heaves the surface, and gives a better finish at sealcoat.

We use hot water pressure washers and a range of pressures. Doing this removes dirt, oils, and dust out of the poors in the surface of the concrete and or asphalt. This is also a requirement when it comes to the repainting, or new construction paint so the paint can last for a much longer time period. Pressure washing the surface before you paint helps remove any oils, dust, and mud from the construction phase. Doing this helps the paint last longer and shows that new look.
